Loading...
HomeMy WebLinkAbout233242 - Marquette- Rev 0.pdf-SEALED Penn FUSION Engineering August 31, 2023 Cedar Creek Energy 3155 104th Ln NW Blaine,MN 55449 RE Marquette Residence 6438 Riverview Terrace NE,Fridley,MN 55432 Client Project#:14.0309 PFE Project#: 233242 On behalf of Cedar Creek Energy,Penn Fusion Engineering LLC (PFE)performed a structural analysis of the roof at the above referenced location.The purpose of our analysis was to determine if the existing roof system is structurally sufficient to support the new photovoltaic modules in addition to the code required design loads. Our analysis is based on the information provided by Cedar Creek Energy and is limited only to the areas where the modules are intended to be placed. System Specifications Panel Specs: (57)Rec-420AA PURE-R Racking System: SNAPNRACK- UR The modules are to be located on the following roof planes: Roof Mounting Member Member Horizontal Sheathing Roofing Roofing Plane Size Spacing Span Type Layers 1 Truss 24" 38'-1" CDX 1/2" Asphalt Shingles 1 2 Truss 24" 38'-1" CDX 1/2" Asphalt Shingles 1 3 Truss 24" 19'-0" CDX 1/2" Asphalt Shingles 1 4 Truss 24" 28'-6" CDX 1/2" Asphalt Shingles 1 Design Criteri of Building Code(s) Ground Snow Pq Wind Speed V • 2021 IBC 50 psf 115 mph • 2021 International Residential Code •ASCE 7-16 Analysis Results 7Mounting Max Attachment Rafter Plane Attachment Hardware Spacing Pass/Fail 1 Snapnrack L-Foot 48" Pass 2 Snapnrack L-Foot 48" Pass 3 Snapnrack L-Foot 48" Pass 4 Snapnrack L-Foot 48" Pass Penn Fusion Engineering LLC- 152 S. Broad St. - Lansdale, PA 19446-215-361-8040 This office has determined that the existing roof as specified above will meet the structural requirements of the above referenced codes in addition to the PV load when installed in accordance with the manufacture's instructions. If you have any questions regarding this analysis, please feel free to contact us. Best Regards, Penn Fusion Engineering, LLC Andrew D. Leone, P.E. Principal Digitally signed by I hereby certify that this plan,specification,or *.pennfusioneng.com report was prepared by me or under my direct supervision and that I am a duly Licensed * DN: cn=*. ennfusionen com, o=Penn Professional Engineer under the laws of the pennfusi p g State of Minnesota ' Fusion Engineering, LLC, An A DN R�DOMEN C LEONE email=aleone@pennfusioneng.com, Print Name: 1=Lansdale, st=PA, c=US Signature: oneng . com Reason: This Document is Certified Date License# 60316 Location: Penn FusionEng.com Date: 31.08.2023 17:47:44 +0000 Penn Fusion Engineering LLC- 152 S. Broad St. -Lansdale, PA 19446-215-361-8040