Loading...
HomeMy WebLinkAbout13918-pillsbury (2) Generation Chimneys, Inc. 18730 Buchanan Street NE East Bethel,MN 55011 763-772-0815 1-888-PIXLEYS www.2ndGenerationChinmeys.com Tra.'BC737441 PROPOSAL 013918 PROPOSAL SUBMITTED TO: PHONF/EMAII.: DATE: Margaret Pillsbury 320-492-5782 08/08/23 mvillsburv@live.com STREET: 861 Rice Creek Terrance Northeast CITY,STATE,AND ZIP CODE: Fridley, MN 55432 WE HEREBY PROPOSE TO FURNISH MATERIAL AND LABOR-COMPLETE IN ACCORDANCE WITH THE SPECIFICATIONS BELOW: We propose to furnish materials and labor necessary to: Remove and dispose of the crown, 5 courses of brick and all flue tiles for the upper and lower-level fireplaces. Install 5 courses of brick. (Roofline,up) Install 2 stainless-steel HomeSaver lining systems. (U.L. listed with manufacturer's lifetime limited warranty) Install 2 decorative top flue tiles with 'I/4"expansion joints. Pour a 3"crown with a 3"dripledge. Seal the crown,exterior brick and flashing. Install 2 stainless-steel rain covers and screens. (Lifetime warranty) Also to include: Home interior, ground and roof protection; scaffold set-up and removal; equipment set-up,tear down and removal; clean-up; landfill/recycle,travel and unload; form removal; building permit and inspection as applicable. Material 46', 10"HomeSaver/12 H.S./Chambertech 2000 13"x 13"the/caps/CS/FS/20 Quikrete 2 silicone/1/4"expansion 100 brick/4 Spec Notes: To be completed in 3 business days via 3 certified technicians. You may also want to consider a wood-burning insert as an alternative option. Please contact our office for more information. Total: $15,200.00 Payment to be made as follows: In order to get on our schedule, a non-refundable 15% ($2280.00)material deposit is required. The balance will be due in full upon completion date. All credit card transactions over$1000.00 are subject to a 3% service charge. This proposal may be withdrawn by us if not accepted within 30 days. Please contact our office to schedule or for any questions. Thank you Please Note: If during breakout,we find a code violation...we reserve the option to stop the job,show the homeowner and/or consult with the building inspector. The extra repairs necessary may result in additional fees for the job. Acceptance of Proposal: All material is guaranteed to be as specified. All work is to be completed in a substantial workman-like manner according to specifications per standard practices. The above prices,specifications and conditions are satisfactory and are hereby accepted. Payment will be made as outlined above. Date of Acceptance: Date of Completion: Signature: Signature: I Exterior access l S: Exterior chimney 2 r Interior w; • ' s Eroded mortar joint . .�` ._,;. ...tom ••� '• '• ,i • ;.1``�►r • -ET"ROTFIRMI • l '.I J r .,�,.y.`,�� •ram , •• •���,�'; ., 1 ` , 1