Loading...
HomeMy WebLinkAboutPLANS (3) I � r� �Sr l - E_ tu D,Z SS 5l bl fl Zl ll 6l 6 8 L 9 I 1 r:. �I ^d removini �i door and frame to fit tub I _ _ AQUARIUS � --' I GE PowerMark Gold M 8 Circuit t nad Comer , f t l - �: '�___ �,�, A� ■ .�� ,�.�.. Electrical Requirements Brief drscrlption of wort, to be perfornicrl wire in an alexis walk in tub I nee mer box_ Electrical Service Panel Brand: (Take clear pictures of panel and surrounding area) Panel location: utilities room Square D QO Squaw D Itomeline GE Siemens � V Eaton BR/CL Eaton CH Other: Number of open breaker positions: 0 Tub Circuits: Installing new tub circuit? &r No Number of circuits required: 1 or 0 Type of Tub? Ventilation fan: n a Fan only or Fan/light Combination Replace existing or New Preferred location: Exlsiting venting or New Venting Shower light: Yes or No Replace existing or New Recessed or Surface Mount Basement ceiling: X pen joists or Drop Ceiling or Sheetrock/plaster House Structure: 1 story or X2 story or Split level 11�1L3Uv�S►�� � . Date: - �(� � �C� Customer Name: C- N� . ( �.C:r"fG � Inspector. Address:1 J.� rr��rt� ..r'T t% �l% 11'1ad CQ ' i f WINOOWf. G UAT11`: Bath Inspection: Parking access for truck/trailer yes ❑ no(explanation) Garage/warm cutting area yes no(explanation) Bathroom level 1st 2nd 3rd Zs- basement Bath to be remodeled is only bath in home yes no Crawl space only below bath EI yes ®• no (if yes)access point Drain exposed yes no (if no,choose) 0 drywall covered dropFeiling Access Panel to valve yes no (c'Xe-rl-cA wLAC 1-116 Water shut off location 1�C 1't( �l l,t l� !f%��1►t Condo yes Lz,\1. no Maintenance/water shut off contact Multifamily ❑ yes DY'no Maintenance/water shut off contact Shut off works V_S yes ❑ no sticky El currently leaks Plumbing composition ® copper E pvc Elgaly cpvc F j pex lead IJ abs New Plumbing composition Pex 3(Shower) � Pex 4(Tub) Existing plumbing has venting through the roof yes no Pre-Install drain function slow good doesn't drain Pre-Install water pressure slow �j good no pressure Flooring has In floor heat yes no Floor framing U wood M concrete Spancrete Ej steel Floor integrity solid soft rotted Floor covering vinyl 1:1hardwood the U carpet U laminate Wall framing �-wood F1 concrete ❑ steel Wall coverings drywall � the lath/plaster paneling Left wall plumb leans In leans out _" in Right wall © plumb n leans in D leans out " In Back wall ® plumb F1 leans in leans out " In " Floor left to right © level slopes left slopes right " In " Floor back to front level slopes back slopes forward " in " Ceiling left to right level El slopes left D slopes right " In " Doorway accessibility door 1 width door 2 with door 3 width Hall accessibility width Tight turns yes no Obstructions U yes K no (if yes, list below): Sizing and accessories: .7�� ;hViy Contract calls for pan size width -� LIength Customer Signaturr Contract size meets customer's expectation yes l no(explain below) Customer Signature Actual size to install: [�C� Length(Left to Right) J ` Width(Front to back-vie �d from threshold to sU wall) Skirt Height(tub) Customer Signature Distance from skirt to center of toilet If parallel I t Distance from skirt to front of toilet If perpendicular Currently finished-length (finish to finish +1") X width Initial Adding/moving wall-length(finish to new stud wall +1/2") X width Initial Already demoed-length (stud to stud) X width 1 Initial Accessory Color: CH ) BN ORB MB Customer Signature If differs from contract, pleas to reason why: Shower Door: Glass: 171 CLEAR RAIN OBSCURED Swing doors: Hinge side: Handle side: Inline location: *Will be ordered by the pan size minus 2" Customer Signature r^ California glass:will be 6"-10"from ceiling height and no less than 30"wide(36"glass Is preferred)to allow enough room for the open�nl;and to minimize water outside of wet arca(only available on pan 60"or longer) Glass width Gk!sz height Customer Signature_ X �� Options: _ v Wall system to be notched around IV A Customer Accepts-Signature J O Will cover current flooring yes no Customer Signature n l 4-` << Trim needed to cover flooring 1/4 round 2"lattice custom cut wall section New drain location C Igff rl ht center custom Customer Signature !L� Custom drain location In "from left stud "from right stud "from back stud Corner trim city Herring bone city Wainscoting qty Wainscoting corners Inside qty outside city Installing fan/light replacing existing U new yy�� Fan vent will vent to Customer Signature_ /1 Pics taken drain/plumbing shower from all angles current damages access areas water shut offs parking areas of concern breaker box 'Customer understands some baths based on extra accessories,options,complexity and unforeseen issues may be scheduled for more than or could take longer than one day. Customer Signature— � Date: Inspector. Special notes section: W,'( �� A Cl �A,,,�, boX r OLr Aty h ` - -VVXL ce I \ 1 —-0 6 II O ; 1 U� L f �l 7;I!C SOro K av%l mcvc kubobvi- l _1 n s I.,Q Cra t Ak �� '(�! 1� ( lG �,�W� 01 Sketch area Ct-•v� 1 �� d 38 o � � a v of � i 3v C;� U.S J � 'J • 3 � O n m r Z T o G) -{ � m I 1' c- D n ❑ C Z O a CL W ' Q U QI x r vp m .............................•-= ••----......_......------.......... H � - -� - -� - 7 to 0 O10)J1 ........................................ n 7 C ........................................ oz CDop + c, x cn 0 3 _ - CDCL CD 1 0 o o ❑ ❑ m m G� m Z o- ....................................... C� 2 -A --1 � � w p� ........ � o 1, ❑ rr ❑ ---------------------------•---------------.•--................... CD a CL C� s c k I n 7n — o z c� m 4 m o (D op-( DO C) y m mad cuty Bath Labor Measure Assessment Form WINDOWS & BATHS Job NameA-1 4-u, f 11rlr^Ir e #` Insialler';,ame, Address City: �—ri Install Date Demo- Fiberglass shell,shower board,drywall system/backer Each Demo-Cast tub,tile wa!ls,lath and plaster,concrete wall system/backer Each Bust concrete/restructure joists-need pits&need mngr approval Each Build and Install valve/drain/water shutoffs Each Install tub/shower pan/barrier free/whirlpool Each Install wa'k in tub-Alexis 1 Each Wall prep includes all drywal'/ply/insulation Each Install neo angle wall system Each Install 3 wall system smooth Each Install 3 wall system tile/Impressions Fact) Install tall 3 wall system with herringbone Smoot or tile Each Install ceiling panel or extra wall Each Install corner shelf/surface self/caddieJfoot pod 2 Each Install bench/earner/fe'ding/formed corner seat/win kit Each Install grab bar Each Install shower rod -ach Install Standard/s-curve Each Install Swing door-includes inline panel Each Install Swing door W/inline&return panel or neo angle Each Install Cayman door Each Install shower head and all cover trims Each Install Kauai/slide bar hand held and all cover trims Each R&R toilet or vanity to install tub/shower Each Remove or build wal.'/remove or bui'd drop soffit Each R&R door and trimwork to bring unit Into room Each Remove old and install new vent fan/fight and connect Each Trip charge 25-50 from shop Each Trip charge SO-75 from shop Each Tr p charge 7S*from shop Each There will be no write Ins allowed.All prices listed are non negotiable Total Invoice: Any work not authorized with management and photos will not be paid ate G Inyot This invoice will be paid only on complete and collected jobs �— Invoices must be submitted daily MeasU• Tech Ignature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization