HomeMy WebLinkAboutResidential Permit Card with Standard Notes BUILDING INSPECTIONS DEPARTMENT PERMIT NUMBER' MR23-000365
7071 UNIVERSITY AVE NE '
FRIDLEY,MN 55432
PHONE: (763)572-3604 ISSUE DATE: 10/17/2023
ADDRESS: 1120 LYNDE DR NE
PERMIT TYPE:Mechanical Residential Permit
PROPERTY TYPE:Replacement
CONSTRUCTION TYPE: Replacement
VALUATION: 0
NOTE: REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT PROPERTY OWNER
Metro Heating and Cooling LLC ZEGITA T M&WOLDEMARIAM W Z
1220 Cope Ave E
Maplewood,MN 55109 1120 LYNDE DR NE
(651)294-7798 FRIDLEY,MN 55432
PAYMENT INFORMATION
Description Total Cost
Mechanical Permit Fee 35.00
State Surcharge Fee 1.00
TOTAL 36.00
Payment(s)
Credit-MR23-000365 - 120064448345iL1/z36
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or
work is suspended or abandoned for a period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit
does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the
performance of construction.
Applicant Date: 10/17/2023
Bldg Insp Date 10/17/2023
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 10/17/2023
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#MR23-000365
ADDRESS : 1120 LYNDE DR NE PERMIT APPLICANT:
PIN: 243 0243 1 0024 Metro Heating and Cooling LLC
LYNDALE BUILDERS 6TH
ADDITION CITY OF FRIDLE
LOT 6 BLK2 LYNDALE BLDRS 1220 Cope Ave E
LEGAL DESC : 6TH-SUB7 TO DRAINAGE& Maplewood,MN 55109
UTIL EASE OVER S5 FT-
PERMIT TYPE : Replacement (651)294-7798
PROPERTY TYPE: Replacement
CONSTRUCTION TYPE: add gas shut off valve to
range and range hood
NOTE:
NOTE: REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Heating Rough In Inspection
Gas Piping/Air Test
Heating Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.