Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Material list
Item CITY Cost Concrete Mix-60 Ibs 14 $ 3.67 AC21 2 x 4 x 10' Ground Contact Green Pressure Treated Lumber 1 $ 6.49 2 x 4 x 10' Construction/Framing Lumber 1 $ 4.87 2 x 4 x 8' Construction/Framing Lumber 15 $ 3.68 48" vanity with top: HO supplied 0 Mastercraft° 3/8 x 2-3/4 x 12' Unfinished Oak Colonial Base Moulding 634 1 $ 16.08 Mastercraft° 3/8 x 2-3/4 x 8' Unfinished Oak Colonial Base Moulding 634 3 $ 10.72 Mastercraft° 5/8 x 2-1/4 x 7' Unfinished Oak Colonial Casing 356 5 $ 10.44 Mirror, bath hardware allowance 0 $ 200.00 Schlage° Georgian Aged Bronze Bed & Bath Privacy Door Knob 0 $ 26.97 National Hardware° Oil-Rubbed Bronze Hinge Pin Door Stop 0 $ 2.48 EZ-HangT" Door or Window Installation Kit 1 $ 5.16 Nelson 7-7/8" Pine Shims- 12 Pack 1 $ 1.56 Lighting allowance 0 $ 125.00 Tax Subs Demo 1 $ 400.00 Concrete 1 $ 400.00 Framing 1 $ 400.00 HVAC 2 $ 375.00 Plumbing: HO supply fixtures 1 $4,190.00 Electrical 1 $3,600.00 Insulation 8.5 $ 19.00 Drywall 1 $1,100.00 Trimming 1 $ 400.00 Hardware 1 $ 200.00 Wood/LVP floors 1 $ 300.00 Cleaning 2 $ 55.00 Dumpster 1 $ 180.00 Rental 1 $ 125.00 Total 0 and P