Loading...
HomeMy WebLinkAboutFinal foundation repairs 378 66 Ave APPROVED Job Details JensenD10/31/2023 This plan copy to be at job site (7)Helical Plere by Innov. 8)on the west wall and(4)o the south wall. E,1ng anchors Installed by nnovative on the other half oft wall Foundation height 7' Unbalanced grade height 6' Type of soil-Sand/Clay location of anchor at foundation-2'below soil line or below cre Depth of earth anchor below grade-48" Length of the connecting rod-11' Spacing of the anchors-T from comer,up to 6'apart ® Smoke detectors in each :J,��ontal sleeping room and on each level of the house per R314 AW will Install(6) Interior push piers. e and replace concrete Front whare AW installs piers. 3786E Ave NE vold fill under the footing CO detection per R315 FMInneapals,MN;sas2 4nstall2 C.Lo&An= 2020 I RC. Typeof Wall ................................................................................................................................................. Block Existing Wall Finish ............................................................................................................................. Plain/Paneling Existing Floor Finish ............................................................................................................................. Concrete/Tile AMERICAN WATERWORKS Job Location Page 2/7 1307 Val leyhigh Dr NW Rochester MN 55901 378 66th Ave NE Minneapolis MN 55432 10-6-23(3)