HomeMy WebLinkAboutFinal foundation repairs 378 66 Ave APPROVED
Job Details JensenD10/31/2023
This plan copy to be at job site
(7)Helical Plere by Innov.
8)on the west wall and(4)o
the south wall.
E,1ng anchors Installed by
nnovative on the other half oft
wall
Foundation height 7'
Unbalanced grade height 6'
Type of soil-Sand/Clay
location of anchor at foundation-2'below soil line or below cre
Depth of earth anchor below grade-48"
Length of the connecting rod-11'
Spacing of the anchors-T from comer,up to 6'apart
® Smoke detectors in each
:J,��ontal
sleeping room and on each level
of the house per R314
AW will Install(6)
Interior push piers.
e and replace concrete
Front whare AW installs piers.
3786E Ave NE vold fill under the footing CO detection per R315
FMInneapals,MN;sas2 4nstall2 C.Lo&An= 2020 I RC.
Typeof Wall ................................................................................................................................................. Block
Existing Wall Finish ............................................................................................................................. Plain/Paneling
Existing Floor Finish ............................................................................................................................. Concrete/Tile
AMERICAN WATERWORKS Job Location Page 2/7
1307 Val leyhigh Dr NW Rochester MN 55901 378 66th Ave NE Minneapolis MN 55432 10-6-23(3)