HomeMy WebLinkAboutsite layout house
41'-b 1/4"
10, replace door
o change to rough opening
12,
UP
ew deck
see plans for 3-season porch
far now making it a deck,but setting it up for future 3-season porch
r
22'-31/2"
I
I I
I I
I I
new ramp
I I
y Y driveway F
garage
I I
I I �
I I
I I
I I
Span cerand hdina
bb99 Madison 5t NE
Fridley,MN 55432 L
site layout
ew landings
5'
wood modular ramp materials green treated: `
4.4
posts as supports with l kW pad on bottom �5' 15'-63/ib"
4
x4 support spacing drawn on layout
-0x4 posts fastened with b"GRK screws 5/16"diameter - -
4x4 tall support:
-hon-ntal crass brace 2xb
-diagonal crass brace 2x4 new ramps UP
horizontal and diagonal bracing fastened with grk 5/16"diameter screws
-2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member
4x4 short support:
-hon-ntal crass brace 216
-2x4 trimmer nailed to 4x4 up to bottom of 2xb crass member
-plywood gusset grk 5/16"diameter screws through cross brace and 4x4 post
-plywood gusset nailed to 2xb cross brace and 2x4 triimer
plowed graspable 2x6 handrail on both sides of each ramp section with spindles
-spindles on ramp sections and landings spaced 3.5"apart
amp clear width 3T
2xb guard rail on landings with spindles
ramp connections at each ramp section or into landing
{3)3/b"x 4"carriage bolts acq at each connection