Loading...
HomeMy WebLinkAboutsite layout house 41'-b 1/4" 10, replace door o change to rough opening 12, UP ew deck see plans for 3-season porch far now making it a deck,but setting it up for future 3-season porch r 22'-31/2" I I I I I I I new ramp I I y Y driveway F garage I I I I � I I I I I I Span cerand hdina bb99 Madison 5t NE Fridley,MN 55432 L site layout ew landings 5' wood modular ramp materials green treated: ` 4.4 posts as supports with l kW pad on bottom �5' 15'-63/ib" 4 x4 support spacing drawn on layout -0x4 posts fastened with b"GRK screws 5/16"diameter - - 4x4 tall support: -hon-ntal crass brace 2xb -diagonal crass brace 2x4 new ramps UP horizontal and diagonal bracing fastened with grk 5/16"diameter screws -2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member 4x4 short support: -hon-ntal crass brace 216 -2x4 trimmer nailed to 4x4 up to bottom of 2xb crass member -plywood gusset grk 5/16"diameter screws through cross brace and 4x4 post -plywood gusset nailed to 2xb cross brace and 2x4 triimer plowed graspable 2x6 handrail on both sides of each ramp section with spindles -spindles on ramp sections and landings spaced 3.5"apart amp clear width 3T 2xb guard rail on landings with spindles ramp connections at each ramp section or into landing {3)3/b"x 4"carriage bolts acq at each connection