Loading...
HomeMy WebLinkAboutFinal deck and ramp review 6899 Madison street This plan copy to be at job site house 41'-6 1/4" 10' - replace door 2x10vmtm Imgm no change to rough opening EnP mP 12' 4' APPROVEDI ��°rso�.9.zozol Hand rail xma�m,msrmaa r rov eprgx:r krlger/si6nglazM1ing PROVIDE STAIRWAY ILL MINATION tJP SEPARATE PERMITS FOR:ELECT,PLUMB.MECH. M new deck IN STAIR RISE;]&4" MIN TREA 10" Eb12xB 2xB ib"o.c green vmtm angmm E612x1016"o.cgrmn Vm[m 5I49reenVm[1 Emking 42--d.15"Elametu hangerm 42"EseP W[h bellm bottom 5149reen Vm[m Emking Ebl2xB Eb12x10 - 4x4 posts b'spacing green vmtm msa 2xb guaMnll green vmtm 2#5PlnE le green b 2.bottom nll green vm[m 6 d-10 nnm aunHo HEbHr.sc E612x10 pbl2x8 r ko0ngs 15"Elame[u Permit is for deck only.po h would 2qui,a separate 42"Eeep 1422-3 permit and an engineered design I I I I I I new ramp I I garage I I I I I I I I I I Spencer and Adina bbqq Madison St NE Fridley,MN 55432 L ramp layout slope 1:14.3 new landings 5' wood modular ramp materials green treated: 4x4 posts as supports with 1'x1'pad on bottom AA support spacing drawn on layout AA posts fastened with b"GRK screws 5/16"diameter N 4x4 tall support: -horizontal cross brace 2x6 -diagonal cross brace 2x4 horizontal and diagonal bracing fastened with grk 5/16"diameter screws -2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member 5' 15'-6 3/16" 4x4 short support: -horizontal cross brace 2xb -2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member -plywood gusset grk 5/16"diameter screws through cross brace and 4x4 post new ramps -plywood gusset nailed to 16 cross brace and 2x4 trilmer UP plowed graspable 2xb handrail on both sides of each ramp section with spindles -spindles on ramp sections and landings spaced 3.5"apart -ramp clear width 3T 2xb guard rail on landings with spindles ramp connections at each ramp section or into landing N)3/6"x 4"carriage bolts acq at each connection