HomeMy WebLinkAboutFinal deck and ramp review 6899 Madison street This plan copy to be at job site
house
41'-6 1/4"
10' - replace door
2x10vmtm Imgm no change to rough opening
EnP mP
12' 4'
APPROVEDI ��°rso�.9.zozol Hand rail
xma�m,msrmaa r rov eprgx:r krlger/si6nglazM1ing
PROVIDE STAIRWAY ILL MINATION tJP
SEPARATE PERMITS FOR:ELECT,PLUMB.MECH.
M
new deck IN
STAIR RISE;]&4"
MIN TREA 10"
Eb12xB
2xB ib"o.c green vmtm
angmm
E612x1016"o.cgrmn Vm[m 5I49reenVm[1 Emking 42--d.15"Elametu
hangerm 42"EseP W[h bellm bottom
5149reen Vm[m Emking
Ebl2xB
Eb12x10 -
4x4 posts b'spacing green vmtm msa
2xb guaMnll green vmtm
2#5PlnE le green b
2.bottom nll green vm[m
6 d-10
nnm aunHo HEbHr.sc E612x10
pbl2x8 r
ko0ngs 15"Elame[u
Permit is for deck only.po h would 2qui,a separate 42"Eeep 1422-3
permit and an engineered design
I I
I I
I I
new ramp
I I
garage
I I
I I
I I
I I
I I
Spencer and Adina
bbqq Madison St NE
Fridley,MN 55432 L
ramp layout
slope 1:14.3
new landings
5'
wood modular ramp materials green treated:
4x4 posts as supports with 1'x1'pad on bottom
AA support spacing drawn on layout
AA posts fastened with b"GRK screws 5/16"diameter N
4x4 tall support:
-horizontal cross brace 2x6
-diagonal cross brace 2x4
horizontal and diagonal bracing fastened with grk 5/16"diameter screws
-2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member 5' 15'-6 3/16"
4x4 short support:
-horizontal cross brace 2xb
-2x4 trimmer nailed to 4x4 up to bottom of 2xb cross member
-plywood gusset grk 5/16"diameter screws through cross brace and 4x4 post new ramps
-plywood gusset nailed to 16 cross brace and 2x4 trilmer UP
plowed graspable 2xb handrail on both sides of each ramp section with spindles
-spindles on ramp sections and landings spaced 3.5"apart
-ramp clear width 3T
2xb guard rail on landings with spindles
ramp connections at each ramp section or into landing
N)3/6"x 4"carriage bolts acq at each connection