Loading...
HomeMy WebLinkAboutMaterials Job Details (Continued) Specifications WaterGuard-Full perimeter with a lateral feed line and vapor barrier is always recommended. WaterGuard Ports-Homeowner may need to create an access point to service WaterGuard ports. Bring soil fabric,flangless WaterGuard,FlowGuard 1st Annual Maintenance-Contacted 9-12 Months Post Project to Schedule Sealing WaterGuard for Radon-We recommend a vapor barrier before any sealing of our system. SuperSump Plus-We recommend annual maintenance,this is not needed to maintain the warranty,just a means of being proactive. IceGuard-IceGuard may experience ice damming in the winter,this means it is working. Standard Discharge Line.3"Flex hose and IceGuard Contractor Will 1.)Remove finished walls as necessary.Not responsible for replacement. 2.)Offer a free Radon Charcoal test with design during the initial appointment. 3.)Review contract drawing page and notes with the customer. Customer Will 1.)Move items at least 7-10 feet away from the work area.American Waterworks is not liable for damages of items left in the work area, delay in the project may result. 2.)Remove cabinets/shelving. 3.)Remove flooring at least 2 ft from the wall and/or working area,(Carpet 4ft). If not removed,contractor is not responsible for damages. 4.)Make sure smoke/CO detectors are up to code(additional cost to the homeowner may occur if not done). 5.)If applicable,move water heater,water softener,HVAC,toilet etc.2ft from foundation walls. If not moved,we will go around,not responsible for damages. 6.)The customer agrees that if work area is not cleared,delays or rescheduling of the project may result. 7.)The customer will be available during the project. 8.)If the customer will list is not complete before the project start date,the customer's discount may be void and additional charges may apply. 9.)By signing,customer has reviewed the drawing,understands the drawing notes and understands the expectations of the"Customer Will"section. Customer Signature: Date: Product List My Basement WaterGuard ................................................................................................................................................ 27 ft WaterGuardPort .............................................................................................................................................. 1 AdminFees ..................................................................................................................................................... 1 StoneWall/Thin Concrete ......................................................................................................................... 27 Linear 1stAnnual Maintenance ..................................................................................................................................... 1 SealWaterGuard .................................................................................................................................... 27 Linear SuperSumpPlus ................................................................................................................................................ 1 IceGuard ........................................................................................................................................................ 1 AMERICAN WATERWORKS Job Location Page 3/8 1307 Valleyhigh Dr NW Rochester MN 55901 161 River Edge Way NE Minneapolis MN 55432 11-20-23(3) Product List (Continued) DischargeLine-Standard .................................................................................................................................... 1 AMERICAN WATERWORKS Job Location Page 4/8 1307 Valleyhigh Dr NW Rochester MN 55901 161 River Edge Way NE Minneapolis MN 55432 11-20-23(3)