Loading...
HomeMy WebLinkAboutMATERIALS LIST MATERIALS FRAMING 2x4 studs and plates WALLCOVERINGS 1/2" drywall 4 mil poly R-13 batt insulation Joint compound Wall primer Wall paint SHOWER WALLS 1/2" cement board on walls with fiberglass taped seams and cement board screws SHOWER FLOOR/bench seat Bench and framing will be treated wood Pre-slope shower pan will be tar-papered, metal lathe, and floor mix with slope at minimum of 1/4n Shower pan and curb will be metal lathe and floor mix Waterproofing paint for the shower pan Integrated rubber membrane over bench seat and attached to new drain assembly Ceramic tile at the shower walls, floor and bench Premium thinset mortar for tile setting FLOOR Subfloor will be as required for height (3/4" T & G, glued and screws) Cement subfloor will be metal lathe attached to wood subfloor with self-leveling cement applied Ceramic flooring MECHANICALS ELECTRICAL (electrical subcontractor will pull permit in conjunction with mine) Any new or disturbed circuits will be arc fault protected Install new outlets, vanity lights, exhaust fan, moisture rated can light at the shower New smoke detectors and CO2 detectors will be installed as needed PLUMBING (plumbing subcontractor will pull permit in conjunction with mine) Rough in new plumbing and update any existing drain lines to 2" Install new drain for integrated shower membrane Install new shower control valve with rain heads (kept in the heat envelope) Install new drain, water, and vent lines as per code Install plumbing fixtures including toilet, vanity sink and faucet, and shower finishes