Loading...
HomeMy WebLinkAboutNorris Side Entry NO PRICE 112923 Philip & Julia Norris +1 1383 76th Ave NE Ca l.le Fridley,MN 55432 Building&Remodeling (612) 532-6832 Die best value in professional remodeling Email: pennwc@gmail.com PROPOSAL ALL PRICING VALID FOR 14 DAYS. Project Description: Date: 11/29/2023 Side Entry& Sidewalk • Demo existing stoop & sidewalk along driveway • New sidewalk(flush with driveway) & Concrete footings • Frame new stairway& landing up to side entry, Frame new roof over landing • New fiberglass roof w/kick flashing& gutter w/ downspout • New decking, treads, risers, railings, & skirt boards. • Patch affected siding • Temporarily remove& reinstall lighting fixture for duration of construction process • Any/all landscaping to be done by others Qty. Unit Image 01.Permits and Design Permit 1 EA Design and Planning Process(Paid)--See Design and Planning Agreement for Details. 1 EA Subtotal-Cate2ory 1 02.Site Prep and Demolition Site Prep Small to Medium Project(hicludes delivery of tools/equipment and set up of job site). 1 EA Place yard sign and order dumpster. Demolition of work area: Remove siding as necessary to install ledgers for deck landing&roof 1 EA header for covered entry. For demo of Concrete steps&sidewalk,see Cat.04 Concete. NOTE.Although care is taken to carefully complete demolition,screw pops,hairline cracks, 1 Note and other issues can occasionally arise in adjacent spaces. No costs are included in this estimate to patch drywall or plaster or repaint walls in adjacent spaces,but the need could arise. We also use the most expensive and sensitive tape when taping prep to the,/loor, walls,or trim. If it is a bad or old finish,there is a small chance that it may peel off some of the existing finish. Any additional repairs will be an extra charge and dealt with via Change Order. Subtotal-Category 2 03.Landscapin2 and Fence NOTE:Presumes NO landscaping work to be done by Castle. Any/all landscaping work to 1 Note be done by others(client,Field Outdoor Spaces,or other landscape company)after project completion. No landscaping work included in this project.Inchldes repairs of damage done by Castle and Castle sub-contractors. Subtotal-Cate2ory 3 04.Concrete and Foundation 11/29/2023 Castle Building Remodeling 1 Of 3 Concrete Trade Partner 1 EA Walk and two deck footings as per print-Dated-10/09/23 Demo walk and steps and haul off site. Walk-62 sq.ft Standard gray concrete and finish. Two deck footings as needed. Note:Not included in above bid. Relocate or repair any utilities in work scope area. Subtotal-Cate2ory 4 05.Masonry Subtotal-Category 5 06.Framing Frame a covered entry roof with cedar tone treated wood. Includes frame and supports @ 24" 20 SF O.C.-stick framed(materials and labor) Deck Framing Posts:Frame deck posts with treated 6x6's(up to 8'height),as per building 2 EA code.Includes all needed mechanical fasteners(bases,anchors,caps,etc.) Exterior Landing Framing: Frame landing with treated 2X8,16"O.C. Includes install of 20 SF ledger board,rim joist. Includes all needed mechanical fasteners(hangers,etc.) DOES NOT include decking. Deck Stairs: Frame deck stairs(62"W x 30"L x 26-1/4"H)with treated 2X12 stair stringers, 3 Treads 12"O.C.. See Category 10 Includes all needed mechanical fasteners(hangers,etc.) DOES NOT include decking or risers. Subtotal-Category 6 09.Roofing,Flashing,Gutters Furnish and install translucent fiberglass corrugated roof panels. Install kick flashing to move 1 EA water away from siding to fiberglass panel. Furnish and install new 5"standard gutters(5 LF)and 3x4 downspouts(14 LF). 1 EA Color:White Subtotal-Category 9 10.Exterior Trim,Porches and Decks Decking-5/4"X 6",Composite decking with top mount screws and color matched screw hole 32 SF plugs; Match back deck Skirting/stair riser-Kiln dried,Cedar tone Treated 1X10 apron around the perimeter of the 28 LF framing and stair risers. Railing-Cedar tone treated-Includes:4X4 newel posts,vertical 2X4 top and bottom supports 14 LF with a 5/4 X 6 top cap. 2X2 spindles Subtotal-Category 10 11.Siding,Soffit,and Fascia Furnish and install 1 layer Tyvek house wrap(-100 sgft). 1 EA Siding-Reinstall owner-supplied Vinyl(-100 SF)on house 1 EA Manufacturer: Color: Lap Size: Siding:Install owner-suppled vinyl siding on the sides of the new roof(8 SF). 1 EA Facia:Furnish and Install 1 x 6 PVC facia boards along 3 sides ofthe new roof edge(13 LF). Subtotal-Category 11 12.Exterior Doors and Trim Side entry&storm door to remain. Presumes no changes to any/all exterior doors. No exterior 1 Note door work included in this project. Subtotal-Category 12 13.Windows Subtotal-Category 13 14.Plumbing Subtotal-Category 14 15.HVAC Subtotal-Category 15 16.Electrical Remove and re-install light fixture. 1 EA 11/29/2023 Castle Building Remodeling 2 Of 3 Subtotal-Category 16 17.Insulation Subtotal-Category 17 18.Drywall Subtotal-Cate orn 18 19.Tile and Stone Subtotal-Category 19 20.Millwork,Doors Hardware Subtotal-Category 20 21.Cabinetry,Countertops and Appliances Subtotal-Category 21 22.Specialties Subtotal-Category 22 23.Flowing Subtotal-Category 23 24.Painting and Decorating Presumes that any/all materials used are pre-finished by manufacturers/suppliers. No exterior 1 Note paint work included in this project. Subtotal-Cate ory 24 25.Clean Up and Debris Removal Disposal and clean-up-remove all site prep,wipe down and broom sweep area. Haul all extra 1 EA material off site. Note: This doesn't include professional cleaning. Deep clean available at additional cost to be handled on a change order at end of project. DUMPSTER NOTE: If the dumpster is placed on the street,and the city calls a snow 0 EA emergency or street cleaning,there will be an additional$200 charge per move or violation via a change order. Sometimes it will get moved,sometimes it will just get fined. The charge is the same either way. 6 Yard mini roll-off dumpster-smaller truck for smaller places 2.5 ton maximum. NOTE: for 1 EA 30 days only. Use line above for estimated days over 30 days Regular portable restroom(one month) 1 EA NOTE: This cost can be saved if home owner is ok with making a bathroom in the house available to Castle and it's trade partners Subtotal-Category 25 Project Subtotal 26.Designer Oversight&Project Management 27.Overhead and Profit Grand Total" MN License # BC005657 Check or Cash Discount 2 2.50% .5%* Grand Total After Discounts *Doesn't Apply to Bank Financing or loan process that requires Castle to receive payment directly from that entity after Castle has paid subcontractors and secured lien waivers. In these instances Castle essentially acts as the financier for the project and incurs borrowing costs. Exceptions include banks willing to follow Castle payment structure. 11/29/2023 Castle Building Remodeling 3 Of 3