Project Description: Date: 11/29/2023
Side Entry& Sidewalk
• Demo existing stoop & sidewalk along driveway
• New sidewalk(flush with driveway) & Concrete footings
• Frame new stairway& landing up to side entry, Frame new roof over landing
• New fiberglass roof w/kick flashing& gutter w/ downspout
• New decking, treads, risers, railings, & skirt boards.
• Patch affected siding
• Temporarily remove& reinstall lighting fixture for duration of construction
process
• Any/all landscaping to be done by others
Qty. Unit Image
01.Permits and Design
Permit 1 EA
Design and Planning Process(Paid)--See Design and Planning Agreement for Details. 1 EA
Subtotal-Cate2ory 1
02.Site Prep and Demolition
Site Prep Small to Medium Project(hicludes delivery of tools/equipment and set up of job site). 1 EA
Place yard sign and order dumpster.
Demolition of work area: Remove siding as necessary to install ledgers for deck landing&roof 1 EA
header for covered entry. For demo of Concrete steps&sidewalk,see Cat.04 Concete.
NOTE.Although care is taken to carefully complete demolition,screw pops,hairline cracks, 1 Note
and other issues can occasionally arise in adjacent spaces. No costs are included in this
estimate to patch drywall or plaster or repaint walls in adjacent spaces,but the need could
arise. We also use the most expensive and sensitive tape when taping prep to the,/loor,
walls,or trim. If it is a bad or old finish,there is a small chance that it may peel off some of
the existing finish. Any additional repairs will be an extra charge and dealt with via Change
Order.
Subtotal-Category 2
03.Landscapin2 and Fence
NOTE:Presumes NO landscaping work to be done by Castle. Any/all landscaping work to 1 Note
be done by others(client,Field Outdoor Spaces,or other landscape company)after project
completion. No landscaping work included in this project.Inchldes repairs of damage done
by Castle and Castle sub-contractors.
Subtotal-Cate2ory 3
04.Concrete and Foundation
11/29/2023 Castle Building Remodeling 1 Of 3
Concrete Trade Partner 1 EA
Walk and two deck footings as per print-Dated-10/09/23
Demo walk and steps and haul off site.
Walk-62 sq.ft
Standard gray concrete and finish.
Two deck footings as needed.
Note:Not included in above bid.
Relocate or repair any utilities in work scope area.
Subtotal-Cate2ory 4
05.Masonry
Subtotal-Category 5
06.Framing
Frame a covered entry roof with cedar tone treated wood. Includes frame and supports @ 24" 20 SF
O.C.-stick framed(materials and labor)
Deck Framing Posts:Frame deck posts with treated 6x6's(up to 8'height),as per building 2 EA
code.Includes all needed mechanical fasteners(bases,anchors,caps,etc.)
Exterior Landing Framing: Frame landing with treated 2X8,16"O.C. Includes install of 20 SF
ledger board,rim joist. Includes all needed mechanical fasteners(hangers,etc.) DOES NOT
include decking.
Deck Stairs: Frame deck stairs(62"W x 30"L x 26-1/4"H)with treated 2X12 stair stringers, 3 Treads
12"O.C.. See Category 10 Includes all needed mechanical fasteners(hangers,etc.) DOES
NOT include decking or risers.
Subtotal-Category 6
09.Roofing,Flashing,Gutters
Furnish and install translucent fiberglass corrugated roof panels. Install kick flashing to move 1 EA
water away from siding to fiberglass panel.
Furnish and install new 5"standard gutters(5 LF)and 3x4 downspouts(14 LF). 1 EA
Color:White
Subtotal-Category 9
10.Exterior Trim,Porches and Decks
Decking-5/4"X 6",Composite decking with top mount screws and color matched screw hole 32 SF
plugs; Match back deck
Skirting/stair riser-Kiln dried,Cedar tone Treated 1X10 apron around the perimeter of the 28 LF
framing and stair risers.
Railing-Cedar tone treated-Includes:4X4 newel posts,vertical 2X4 top and bottom supports 14 LF
with a 5/4 X 6 top cap. 2X2 spindles
Subtotal-Category 10
11.Siding,Soffit,and Fascia
Furnish and install 1 layer Tyvek house wrap(-100 sgft). 1 EA
Siding-Reinstall owner-supplied Vinyl(-100 SF)on house 1 EA
Manufacturer:
Color:
Lap Size:
Siding:Install owner-suppled vinyl siding on the sides of the new roof(8 SF). 1 EA
Facia:Furnish and Install 1 x 6 PVC facia boards along 3 sides ofthe new roof edge(13 LF).
Subtotal-Category 11
12.Exterior Doors and Trim
Side entry&storm door to remain. Presumes no changes to any/all exterior doors. No exterior 1 Note
door work included in this project.
Subtotal-Category 12
13.Windows
Subtotal-Category 13
14.Plumbing
Subtotal-Category 14
15.HVAC
Subtotal-Category 15
16.Electrical
Remove and re-install light fixture. 1 EA
11/29/2023 Castle Building Remodeling 2 Of 3
Subtotal-Category 16
17.Insulation
Subtotal-Category 17
18.Drywall
Subtotal-Cate orn 18
19.Tile and Stone
Subtotal-Category 19
20.Millwork,Doors Hardware
Subtotal-Category 20
21.Cabinetry,Countertops and Appliances
Subtotal-Category 21
22.Specialties
Subtotal-Category 22
23.Flowing
Subtotal-Category 23
24.Painting and Decorating
Presumes that any/all materials used are pre-finished by manufacturers/suppliers. No exterior 1 Note
paint work included in this project.
Subtotal-Cate ory 24
25.Clean Up and Debris Removal
Disposal and clean-up-remove all site prep,wipe down and broom sweep area. Haul all extra 1 EA
material off site. Note: This doesn't include professional cleaning. Deep clean available at
additional cost to be handled on a change order at end of project.
DUMPSTER NOTE: If the dumpster is placed on the street,and the city calls a snow 0 EA
emergency or street cleaning,there will be an additional$200 charge per move or violation via a
change order. Sometimes it will get moved,sometimes it will just get fined. The charge is the
same either way.
6 Yard mini roll-off dumpster-smaller truck for smaller places 2.5 ton maximum. NOTE: for 1 EA
30 days only. Use line above for estimated days over 30 days
Regular portable restroom(one month) 1 EA
NOTE: This cost can be saved if home owner is ok with making a bathroom in the house
available to Castle and it's trade partners
Subtotal-Category 25
Project Subtotal
26.Designer Oversight&Project Management
27.Overhead and Profit
Grand Total"
MN License # BC005657
Check or Cash Discount
2 2.50%
.5%*
Grand Total After Discounts
*Doesn't Apply to Bank Financing or loan process that requires Castle to receive payment directly from that
entity after Castle has paid subcontractors and secured lien waivers. In these instances Castle essentially acts as
the financier for the project and incurs borrowing costs. Exceptions include banks willing to follow Castle
payment structure.
11/29/2023 Castle Building Remodeling 3 Of 3