Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Final side entry review 1383 76th Ave
HOMEOWNER INITIAL STAMPLAYER DATE: 11/2/2023 NORRIS SIDE ENTRY MINNEAPO DRAWN BY: PH3 TURN OFF PRIOR TO P PRINTING HOMEOWNER INITIAL ISSUE DATES: DES 1:11/02/23 I APPROVED / Jensen DO1/05/2024 N REVISION DATES: - I •4 � I - This plan co job si e py to be at PROPOSED EXISTING w SEPARATE PERMITS FOR: ELECT, PLUMB. MECH. �a WALL KEY ELECTRICAL KEY PAGE CONTENTS 3 o z z ui U') AS-BUILT:12"BLOCK WALL DUPLEX OUTLET �» SINGLE POLE SWITCH 1 COVER PAGE J a M 2 DEMO MAIN LEVEL _ AS-BUILT:12"BLOCK WALL W/FURRING �c GFCIOUTLET "" DIMMER SWITCH 3 PROPOSED MAIN LEVEL z ti DUPLEX OUTLET&SWITCH �3 3-WAY SWITCH 4 FOOTING& DEACK FRAMING w J AS-BUILT:EXTERIOR WALL �,,,p V a LL � WATERPROOF OUTLET ram"" 3-WAY DIMMER SWITCH 5 ROOF FRAMING PLAN AS-BUILT:INTERIOR WALL 6 SECTIONS & ELEVATIONS AS-BUILT:INTERIOR HALF WALL IIa TELEPHONE JACK Qf^ 4-WAY SWITCH 1,- c DEMO:12"BLOCK WALL CABLE JACK so SMOKE DETECTOR O c d, DI ao CAT6 SMOKE/CO DETECTOR N aco DEMO:EXTERIOR WALL R O to ti REFRIGERATOR H EXHAUST FAN V LU to c14 DEMO:INTERIOR WALL °N Z Z DISHWASHER NEW:12"BLOCK WALL W/2"EXTERIOR INSULATION W/ u EXHAUST FAN/LIGHT p U = STUCCO PARGE COAT;2X4 INTERIOR FURRED WALL RANGE C> tZ WITH R-10 CLOSED CELL FOAM INSULATION cr � COOKTOP Q CEILING LIGHT FIXTURE NEW:2X4 FURRED WALL WITH DRYWALL ONE SIDE, �M MICROWAVE R DOWNLIGHT CD CLOSED CELL FOAM INSULATION ONTO EXISTING BLOCK FOUNDATION WALL H Q � EXHAUST HOOD o PUCK LIGHT NEW:FRAMED EXTERIOR WALL co p y CLOTHES DRYER UNDERCABINET LIGHT w NEW:FRAMED INTERIOR WALL cw N Z -e CLOTHES WASHER 10 WALL SCONCE P4 52 NEW:FRAMED HALF WALL ® FLOOR OUTLET w o y bA CEILING FAN �J CEILING OUTLET - .� w I � i -^ AIIAO I AVCR COVER PAGE SPECIAL NOTES This document,plans and specifications are the property of Castle Building&Remodeling, The information,specifications and plans contained on these sheets are a result of job site measurements,sub-contractor The Carpenters and Sub-Con!�a_to yLLndll be responsible to Inc.These plans and specifications are to be used at this customers residence only.Any recomendations,and client consultations.Any unforseen pre-existing conditions after demolition may require change orders inform Castle Bui!d!^g&Per-r,,1eI'?q-d G &INFORMATION reproduction of these plans and/or specifications are prohibited without written consent of and the alteration of the proposed construction practices and procedures.If any such changes occur,Castle Building& discrepancies between the plans and actual 10 site Castle Building&Remodeling,Inc. Remodeling,Inc.must be notified immediately and a change order must be signed by the customer for work to continue. dimensions that will effect the construction or materials. 1 STAMPLAYER DATE: 11/2/2023 Demo MINNEAPOLIS DRAWN BY: PHS •Demo existing side entry steps,the adjacent raised concrete landing, &sidewalk along TURN OFF PRIOR TO PRINTING driveway(stop at lower landing of front entry). To be done by Concrete Trade Partner. ISSUE DATES: •Remove siding as necessary to install ledgers for deck landing&roof header for covered O DES 1:11/02/23 entry. Remove&SAVE exterior ling fixture(to be reinstalled). To be done by castle. PG I 26'-4 3/4" G 2'-6" 19'-10 3/4" 4' �+ ) REVISION DATES: zo fD 04 04 to Zo M M IF X:= Light f ture to be D. DEMO MAIN LEVEL L SCALE: 1/4"=1'-0" 0 2 4 Cn LU a N O ? , z w U') Ledger attachment to house per R507.9.1 .3 2020 IRC Provide proper ledger/siding J a flashing z °� � � lL J M00 ♦'� a U_ 4'-1" 5'-2" oLL 0 C LO z o$ ti ao H-ev p Z C-� ti LU N Cl) W M co ~Z W O U _J a bo LO -0 5'-2" z �a 6 7/8" 4, 7 1/8" CZ A W K °� o rn tA ; ' Z CV I I EDEMO ELEVATION STAMPLAYER DEMO MAIN SCALE: 1/4"=1'-0" ST.PAUL I LEVEL 0 2 4 TURN OFF PRIOR TO PRINTING I I 2 STAMPLAYER DATE: 11/2/2023 MINNEAPOLIS DRAWN BY: PHS TURN OFF PRIOR TO PRINTING ISSUE DATES: O1 DES 1:11/02/23 I ^` A REVISION DATES: Side Entry I •Demo existing stoop&sidewalk along driveway •New sidewalk(flush with driveway)&Concrete footings •Frame new stairway&landing up to side entry, Frame new roof over landing •New fiberglass roof w/kick flashing,gutter&downspout •New decking,treads,risers, railings,&skirt boards. O •Patch affected house siding,Siding on sides new roof&fascia board along roof edge ` •Temporarily remove&reinstall lighting fixture for duration of construction process •Any/all landscaping to be done by others Flush w/Driveway L 21'-9 5/8" 5'-31/2" 4'-01/4" fD lJ d - ° d° n 1 1 j1.J.. F 8 n d< t W cv c _ d d ° L - a a O Z 0 9 - - — a z ui � a > z o �p 0 � IGckout } 4 °° to to ~ 1- J ej loWev landi w ch 0 existing heigT M M 5 _ co F2 U 8- U- 2'-6" Go Q GQ N U- m ti ao E1 0 � G ti U W N PG Cn Lhi co z 24'-2 1/8" o J ax bo �� >~ LO LU Ly bA �J I i I i PROPOSED MAIN LEVEL STAMPLAYER PROPOSED SCALE: 1/4"=1'-0" ST.PAUL MAIN LEVEL TURN OFF PRIOR TO PRINTING 0 2 4 3 STAMPLAYER DATE: 11/2/2023 MI Framing notes TURN OFF PRIOR TOI PRINTING DRAWN BY: PHS OF1 New post footing: 8"dia.x 42"D ISSUE DATES: po g I DES 1:11/02/23 New Post: Treated 4x4 I��O Post Base: Simpson Strong-tie ABW44Z Zmax Adjustable Post Base w/ ` P1 Simpson Strong-tie STB250414P1 Wedge anchor(or EQ) Post Cap:Simpson Strong-tie BCS2-2/4Z Post Cap w/double Shear Nailing or EQ New Post: Treated 4x4 REVISION DATES: OPost Base: Simpson Strong-tie ABW44Z Zmax Adjustable w/Simpson Strong-tie STB250414P1 Wedge anchor(or EQ)set onto concrete sidewalk © New Ledger board: (1)2x8 treated fastened to rim with ledgerloks @12" OC staggered, min. (or EQ) © New Flush Beam: (2)Treated 2x8's New Landing Joists:Treated 2x8's @15-1/8"OC(16"OC max.)Hangers: Simpson LUS28Z New Stair Stringers:Treated 2x12's @15-1/8"OC(16"OC Max) 0 Hanger: Simpson LSCZ Zmax adjustable stair stringer connector(or EQ) Treads: 3,Typ. Rise/Run: 6-9/16"/ 10" L Stringers to rest on Concrete sidewalk Roof Rafters:2x6's @ 24"OC w/blocking as needed R1 Roofing:Translucent fiberglass corrugated paneling w/kick flashing,gutter &downspout Roof Pitch: 3"/12" W a W N O Roof Joist: (1)2x8's Flush w/Driveway 5'-2" 4'-1" p zv E2 a Z Ld U-5 :271'-:9)5/8" a 4'-71/8" PG � 'a co Lu aP2g� ° ZO � 1- � ZO 5 P2 wJ ch a J =a v a 7scft of 4"Co F1 a F1 U a LL 00 � B to � P1 P1 � o M tLouePland' 9 t0 CO J izz z G °O gxisting height � 23 4 co UZO Y a — — — — — — — — — — — — — 0 Iaal E1 b PG I ' ° °a I o bA J FOOTING&DECK FRAMING PLAN >~ N SCALE: 1/4"=1'-0" z 0 2 4 � I I I I STAMPLAYER FOOTING& ST.PAUL DEACK TURN OFF PRIOR TO PRINTING FMMING 4 FRAMING PLAN NOTES: STAMP LAVER DATE: 11/2/2023 MINNEAPOLIS DRAWN BY: PHS 1. ALL EXTERIOR DIMENSIONS TO FACE OF SHEATHING TURN OFF PRIOR TO PRINTING ISSUE DATES: 2. ALL DIMENSIONS TO INTERIOR FACE OF FRAMING -` DES 1:11/02/23 3. WINDOW AND DOOR DIMENSIONS TO CENTERS O Framing notes $ell footings to min 12" at the bottom A REVISION DATES: F1 New post footing: 8"dia. x 42" D 11 New Post:Treated 4x4 Post Base: Simpson Strong-tie ABW44Z Zmax Adjustable Post Base w/ P1 Simpson Strong-tie STB250414P1 Wedge anchor(or EQ) Post Cap: Simpson Strong-tie BCS2-2/4Z Post Cap w/double Shear Nailing or EQ New Post: Treated 44 P2 Post Base: Simpson Strong-tie ABW44Z Zmax Adjustable w/Simpson Strong-tie STB250414P1 Wedge anchor(or EQ)set onto concrete sidewalk t New Ledger board: (1)2x8 treated fastened to rim with ledgerloks @12"OC O staggered, min. (or EQ) i i © New Flush Beam: (2)Treated 2x8's L New Landing Joists: Treated 2x8's @15-1/8"OC(16"OC max.) Hangers: Simpson LUS28Z PG New Stair Stringers: Treated 2x12's @15-1/8"OC(16"OC Max) Cn OHanger: Simpson LSCZ Zmax adjustable stair stringer connector(or EQ) �� W W z v Treads: 3,Typ. Rise/Run: 6-9/16"/10" p1 a a > z Stringers to rest on Concrete sidewalk Roof Rafters:2x6's 24"OC w/blocking as needed OR1 Roofing:Translucent fiberglass corrugated paneling w/kick flashing,gutter — B Z ti LU &downspout = ap w J M D Roof Pitch: 3"/12" R2 R1 L R2 i; a U_ ORoof Joist: (1)2x8's T 11 L � Go o o a, UOI 5'-2" 4' z o$ ti I Z N Go ti LU N Z Z co E1 LU O PG ° _J a bo LO LU Ly bA �J — Z I i I i ROOF FRAMING STAMPLAYER ROOF SCALE: 1/4"=1'-0" ST.PAUL FRAMING TURN OFF PRIOR TO PRINTING PLAN 0 2 4 5 STAMPLAYER DATE: 11/2/2023 MINNEAPOLIS DRAWN BY: PHS MAX STAIR RISE; 7 3/4" TURN OFF PRIOR TO PRINTING ISSUE DATES: MIN TREAD ; 10" O DES 1:11/02/23 Provide deck attachment for lateral support, min (2) Per section R507.9.2 2020 IRC. .. REVISION DATES: PROVIDE A GRIPABLE PROVIDE STAIRWAY ILLUMINATION HANDRAIL WITH 4 OR MORE s,�t STAIRS. •Roofof 3"/ 2" • o Ra rs:2x6's @ 24"OC,Perlins:2x4's @ 14"OC I •Roofing: ranslucent fiberglass corrugated paneling w/kick flashing •Ledger oard:(1)2x8 treated fastened to rim with ledgerioks @12" OC sta gered,min.(or EQ) •Beam:(2)Treated 2x8's � I Deckmn M rn W •Landing:Cedar tone treated 5/4x6 deck boards w/cedar colored top mount screws rein i U) •Stair Treads:Cedar tone treated 5/4x6 deck boards w/cedar colored screws i •Stair Risers:Cedar tone treated 1x10 skirt boards w/cedar colored screws •Perimeter apron:Cedar tone treated 1x10 skirt boards w/cedar colored screw N 00 Railingl36"High) 5 1/2" w w M M •Newel Posts:Cedar tone treated 4x4's 1'3 1/2'1" 0 Z v •Top&bottom rails:Cedar tone treated 2x4's Top Cap:Cedar tone treated 5/4x6 deck board Z L j Lo ' •Top Cap:Cedar tone treated 5/46 deck boards(to go over newel posts),centered on � Q Z M top rail J Q •Spindles:Cedar tone treated 2x2's,spaced a)-4-1/2'OC(centered on top&bottom Downspout, Newel Posts:Cedar tone treated 4x4s _ rails),space between spindles NOT to exceed 4". N F � W •Graspable handrails(both sides of stairway):TBD(Rail style/spec,Species, c w w J hardware/finish) E o- J 0 $� U a LL m Spindles:Cedar tone treated Ledger attachment to house per R507.9.1.3 2020 IRC z,2s,spaced @-a_1/2"oc 'v N M � 9 CV 00 0 O N N Deck Boards&Landing Framing ILL Z ti 2'-6" 3-67/8" MAX RAIL SPACING 4" G Pr MIN GUARD HEIGHT; 31/2" z z co LU STAIRS AND ti Stam LANDINGS MIN. 36" bo r •Typical Rise/Run:6-9/16"/10" WIDE TYPICAL RAILING DETAIL ^� LO •Tread Q y.:3 3 F •Width:62° SCALE: 1/2"=1'-0" 0 W 0 1 2 cz Z Construct guardrail system to withstand min _ _ " 200 lb lateral force Z I E1 CROSS SECTION ELEVATION E2 SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0" s YER SECTIONS& ST P U TURN OFF PRIOR TO PRINTING ELEVATIONS 0 2 4 0 2 4 6 Philip & Julia Norris +1 1383 76th Ave NE Ca l.le Fridley,MN 55432 Building&Remodeling (612) 532-6832 Die best value in professional remodeling Email: pennwc@gmail.com APPROVED Jensen DO1/05/2024 PROPOSAL ALL PRICING VALID FOR 14 DAYS. Project Description: Date: 11/29/2023 Side Entry& Sidewalk • Demo existing stoop & sidewalk along driveway • New sidewalk(flush with driveway) & Concrete footings • Frame new stairway& landing up to side entry, Frame new roof over landing • New fiberglass roof w/kick flashing& gutter w/ downspout • New decking, treads, risers, railings, & skirt boards. • Patch affected siding • Temporarily remove& reinstall lighting fixture for duration of construction process • Any/all landscaping to be done by others Qty. Unit Image 01.Permits and Design Permit 1 EA Design and Planning Process(Paid)--See Design and Planning Agreement for Details. 1 EA Subtotal-Cate2ory 1 02.Site Prep and Demolition Site Prep Small to Medium Project(hicludes delivery of tools/equipment and set up of job site). 1 EA Place yard sign and order dumpster. Demolition of work area: Remove siding as necessary to install ledgers for deck landing&roof 1 EA header for covered entry. For demo of Concrete steps&sidewalk,see Cat.04 Concete. NOTE.Although care is taken to carefully complete demolition,screw pops,hairline cracks, 1 Note and other issues can occasionally arise in adjacent spaces. No costs are included in this estimate to patch drywall or plaster or repaint walls in adjacent spaces,but the need could arise. We also use the most expensive and sensitive tape when taping prep to the,/loor, walls,or trim. If it is a bad or old finish,there is a small chance that it may peel off some of the existing finish. Any additional repairs will be an extra charge and dealt with via Change Order. Subtotal-Category 2 03.Landscapin2 and Fence NOTE:Presumes NO landscaping work to be done by Castle. Any/all landscaping work to 1 Note be done by others(client,Field Outdoor Spaces,or other landscape company)after project completion. No landscaping work included in this project.Inchldes repairs of damage done by Castle and Castle sub-contractors. Subtotal-Cate2ory 3 04.Concrete and Foundation 11/29/2023 Castle Building Remodeling 1 Of 3 Concrete Trade Partner 1 EA Walk and two deck footings as per print-Dated-10/09/23 Demo walk and steps and haul off site. Walk-62 sq.ft Standard gray concrete and finish. Two deck footings as needed. Note:Not included in above bid. Relocate or repair any utilities in work scope area. Subtotal-Cate2ory 4 05.Masonry Subtotal-Category 5 06.Framing Frame a covered entry roof with cedar tone treated wood. Includes frame and supports @ 24" 20 SF O.C.-stick framed(materials and labor) Deck Framing Posts:Frame deck posts with treated 6x6's(up to 8'height),as per building 2 EA code.Includes all needed mechanical fasteners(bases,anchors,caps,etc.) Exterior Landing Framing: Frame landing with treated 2X8,16"O.C. Includes install of 20 SF ledger board,rim joist. Includes all needed mechanical fasteners(hangers,etc.) DOES NOT include decking. Deck Stairs: Frame deck stairs(62"W x 30"L x 26-1/4"H)with treated 2X12 stair stringers, 3 Treads 12"O.C.. See Category 10 Includes all needed mechanical fasteners(hangers,etc.) DOES NOT include decking or risers. Subtotal-Category 6 09.Roofing,Flashing,Gutters Furnish and install translucent fiberglass corrugated roof panels. Install kick flashing to move 1 EA water away from siding to fiberglass panel. Furnish and install new 5"standard gutters(5 LF)and 3x4 downspouts(14 LF). 1 EA Color:White Subtotal-Category 9 10.Exterior Trim,Porches and Decks Decking-5/4"X 6",Composite decking with top mount screws and color matched screw hole 32 SF plugs; Match back deck Skirting/stair riser-Kiln dried,Cedar tone Treated 1X10 apron around the perimeter of the 28 LF framing and stair risers. Railing-Cedar tone treated-Includes:4X4 newel posts,vertical 2X4 top and bottom supports 14 LF with a 5/4 X 6 top cap. 2X2 spindles Subtotal-Category 10 11.Siding,Soffit,and Fascia Furnish and install 1 layer Tyvek house wrap(-100 sgft). 1 EA Siding-Reinstall owner-supplied Vinyl(-100 SF)on house 1 EA Manufacturer: Color: Lap Size: Siding:Install owner-suppled vinyl siding on the sides of the new roof(8 SF). 1 EA Facia:Furnish and Install 1 x 6 PVC facia boards along 3 sides ofthe new roof edge(13 LF). Subtotal-Category 11 12.Exterior Doors and Trim Side entry&storm door to remain. Presumes no changes to any/all exterior doors. No exterior 1 Note door work included in this project. Subtotal-Category 12 13.Windows Subtotal-Category 13 14.Plumbing Subtotal-Category 14 15.HVAC Subtotal-Category 15 16.Electrical Remove and re-install light fixture. 1 EA 11/29/2023 Castle Building Remodeling 2 Of 3 Subtotal-Category 16 17.Insulation Subtotal-Category 17 18.Drywall Subtotal-Cate orn 18 19.Tile and Stone Subtotal-Category 19 20.Millwork,Doors Hardware Subtotal-Category 20 21.Cabinetry,Countertops and Appliances Subtotal-Category 21 22.Specialties Subtotal-Category 22 23.Flowing Subtotal-Category 23 24.Painting and Decorating Presumes that any/all materials used are pre-finished by manufacturers/suppliers. No exterior 1 Note paint work included in this project. Subtotal-Cate ory 24 25.Clean Up and Debris Removal Disposal and clean-up-remove all site prep,wipe down and broom sweep area. Haul all extra 1 EA material off site. Note: This doesn't include professional cleaning. Deep clean available at additional cost to be handled on a change order at end of project. DUMPSTER NOTE: If the dumpster is placed on the street,and the city calls a snow 0 EA emergency or street cleaning,there will be an additional$200 charge per move or violation via a change order. Sometimes it will get moved,sometimes it will just get fined. The charge is the same either way. 6 Yard mini roll-off dumpster-smaller truck for smaller places 2.5 ton maximum. NOTE: for 1 EA 30 days only. Use line above for estimated days over 30 days Regular portable restroom(one month) 1 EA NOTE: This cost can be saved if home owner is ok with making a bathroom in the house available to Castle and it's trade partners Subtotal-Category 25 Project Subtotal 26.Designer Oversight&Project Management 27.Overhead and Profit Grand Total" MN License # BC005657 Check or Cash Discount 2 2.50% .5%* Grand Total After Discounts *Doesn't Apply to Bank Financing or loan process that requires Castle to receive payment directly from that entity after Castle has paid subcontractors and secured lien waivers. In these instances Castle essentially acts as the financier for the project and incurs borrowing costs. Exceptions include banks willing to follow Castle payment structure. 11/29/2023 Castle Building Remodeling 3 Of 3