Loading...
RES 1990-31 - 00003893RESOLUTION NO. 31 - 1990 ' RESOLVTION APPROVING A SUBDIVISION, LOT SPLIT, L.S. #90 -01, 7V SPLIT OFF THE SOUF1HEASrERLY 92.35 FEET OF LOT 8, BLACK 2, MOORE LAKE HILLS ADDITION, TO CREATE A SEPARATE SINGE FAMILY LOT, GENERALLY LOCATED AT 6065 CENTRAL AVENUE N.E. WHEREAS, the City Council approved a lot split at the May 7, 1990 meeting; and the Planning Commission stipulations attached as Exhibit A; and WHEREAS, such approval was to split off the southeasterly 92.35 feet of Lot 8, Block 2, Moore Lake Hills Addition, to create a separate single family lot, generally located at 6065 Central Avenue N.E. The legal descriptions for the two properties are as follows: Northwest Parcel: That part of Lot 8, Block 2, Moore lake Hills, Anoka County, Minnesota, which lies northwesterly of the following described line: A line parallel with an 92.35 feet northwesterly of the southeasterly line of said lot 8 as measured at a right angle to said southeasterly line. Southeast Parcel: That part of Lot 8, Block 2, Moore Lake Hills, Anoka County, Minnesota, which lies southeasterly of the following described line: A line parallel with an 92.35 feet northwesterly of the southeasterly line of said Lot 8 as measured at a right angle to said southeasterly line. ' WHEREAS, the City has received the required Certificate of Survey from the owner; and WHEREAS, such approval will create two separate parcels from Iot 8, Block 2, Moore Lake Hills. NOW, THEREFORE, BE IT RESOLVED, that the City Council directs the petitioner to record this lot split at Anoka County within six months of this approval or else such approval shall be null and void. PASSED AND ADOPTED BY THE CITY OOMCIL OF THE CITY OF FRIDLEY THIS 7TH DAY OF MAY, 1990. ATIIST: 107 Resolution No. 31 - 1990 EXFIIBIT A 1. The petitioner shall move the existing chain link fence from its current location to a location closer to the new lot line. 2. The petitioner shall install erosion control structures (silt fence with hay bales) while the new dwelling is under construction. 3. The swale to be constructed along the south property line of the existing house shall be re vegetated by November 1, 1990. 4. The petitioner shall maintain the swale for one year after construction. 5. Park dedication fees shall be paid at time of building permit issuance. 1 108