Loading...
RES 2011-05 - 14785RESOLUTION NO. 2011 - 05 RESOLUTION REQUESTING MUNICIPAL STATE AID SYSTEM CONSTRUCTION FUNDS FOR OTHER LOCAL USE WHEREAS the City of Fridley receives Municipal State Aid System (MSAS) funds for construction and maintaining 20% of its City streets, and WHEREAS 22.9 MSAS miles are currently authorized and have been improved to State Aid standards and are in an adequate condition that they do not have needs other than additional surfacing, and WHEREAS the City currently has 88.3 miles of local streets that require maintenance and upgrade, and WHEREAS it is authorized by MN Rules 8820.1800 to use part of the MSAS construction appropriation of our City's State Aid allocation on local streets not on the approved State Aid system, and WHEREAS it is proposed to systematically resurface these streets and upgrade the storm sewer system for improved surface water drainage and provide additional strength to the streets for traffic survivability, and WHEREAS it is proposed to use a portion of the City's population allocation funds to upgrade local streets, and WHEREAS the City of Fridley has identified the following MSAS and local (non -MSAS) streets for inclusion in its 2011 Street Rehabilitation Project No. ST. 2011 -1, as listed in attached Exhibit A, WHEREAS the majority of these streets require surface repair and drainage adjustments, and WHEREAS the City indemnifies saves and holds harmless the State of Minnesota and its agents and employees from claims, demands, actions or causes of action arising out of or by reason or matter related to constructing the local streets as designed, and WHEREAS the City further agrees to defend at its sole cost any claims arising as a result of constructing the local streets, and WHEREAS the final approval of the State Aid for Local Transportation Division is therefore required, NOW THEREFORE BE IT RESOLVED that the City of Fridley, Anoka County, Minnesota, requests the release of MSAS funds for the upgrade and reconstruction of City municipal streets, identified as 2011 Street Rehabilitation Project No. ST. 2011 -1. PASSSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEY THIS 3rd DAY JANUARY, 2011. ATTESTED 41-47vie DEBRA A. SKOGEN - VITY CLERK SCOTT J. LUND - MAYOR Resolution No. 2011 -05 EXHIBIT A STREET REHABILITATION PROJECT NO. ST. 2011 -1 PROPOSED IMPROVEMENTS Page 2 Street improvements, including grading, aggregate base, bituminous asphalt, concrete curb and gutter, water and sewer upgrades, landscaping, and other facilities located as follows: 57th Place Main Street to 3rd Street 58t11 Avenue Main Street to 3rd Street 59' Avenue Main Street to 3rd Street 60' Avenue Main Street to 160' E. of 3rd Street Main Street 57th Avenue to 61" Avenue 2nd Street 58th Avenue to 61" Avenue 21/2 Street 571/2 Avenue to 61" Avenue 3rd Street 60th Avenue to 61st Avenue Commerce Circle S. Commerce Circle E. to Commerce Circle W. Commerce Circle W. Commerce Circle S. to 73rd Avenue 73rd Avenue 400' W. of Commerce Lane to Commerce Lane Commerce Lane 73rd Avenue to Osborne Road Main Street Osborne Road to 83rd Avenue 77th Avenue BNSF Railroad to Main Street 79th Avenue BNSF Railroad to Main Street 81st Avenue Beech Street to Main Street Beech Street 77th Avenue to 81st Avenue