Loading...
Res 2014-21 RESOLUTION NO. 2014 - 21 RESOLUTION APPROVING A S-2 REDEVELOPMENT DISTRICT, MASTER PLAN M.P. #14-01, FOR TRIDENT DEVELOPMENT, LLC, ON BEHALF OF THE PROPERTY OWNER, THE CITY OF FRIDLEY HOUSING AND REDEVELOPMENT AUTHORITY, TO ALLOW THE REDEVELOPMENT OF THE PROPERTIES ERALLY LOCATED AT 5831, 5865, 5895, 5905, 5925, 5943, 6005, 6041, 6061, and 6071 UNIVERSITY AVENUE NE. WHEREAS, the Planning Commission held a public hearing on January 15, 2014 to consider a Master Plan request, MP #14-01, by Trident Development, LLC for the properties generally located at 5831, 5865, 5895, 5905, 5925, 5943, 6005, 6041, 6061, and 6071 University Avenue NE in Fridley, legal descriptions attached as EXHIBIT A, and recommended approval of said master plan; and WHEREAS, the Fridley Housing and Redevelopment Authority reviewed the application at their February 6, 2014 meeting and also recommended approval to the City Council; and WHEREAS, the City Council approved the MASTER PLAN, MP #14-01 at their February 10, 2014, meeting, with stipulations attached as Exhibit B; and WHEREAS, a copy of the MASTER SITE PLAN has been attached as Exhibit C and the EXTERIOR ELEVATIONS has been attached as Exhibit D. NOW, THEREFORE, BE IT RESOLVED, that the City Council approves a S-2 REDEVELOPMENT DISTRICT MASTER PLAN, MP #14-01 for TRIDENT DEVELOPMENT, LLC and sends notice to the petitioner that any substantial modification to the approved master site plan, as shown in Exhibit C, will require further review by the Planning Commission and City Council. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF FRIDLEYTHIS TH 10 DAY OF FEBRUARY 2014. ________________________________ SCOTT LUND - MAYOR ATTEST: _________________________________ DEBRA A. SKOGEN - CITY CLERK ResolutionNo.2014-21Page2 ResolutionNo.2014-21Page3 ResolutionNo.2014-21Page4 ResolutionNo.2014-21Page5 ResolutionNo.2014-21Page6 ResolutionNo.2014-21Page7 Resolution No. 2014-21 Page 8 EXHIBIT B MP# 14-01 S-2 Master Plan Trident Development, LLC Stipulations: 1. The property shall be developed in accordance with the master site plan , submitted by hma Architects, dated1/31/14. 2. The building shall be developed in accordance with the architectural exterior elevations sheets , submitted by hma Architects, dated 2/4/14. 3. The petitioner shall obtain all necessary permits prior to construction. 4. The petitioner shall meet all Building code, Fire code, and ADA requirements. 5. The petitioner shall ensure that the any signage meet code requirements and shall obtain a separate sign permit prior to installation. 6. Landscape plan to be reviewed and approved by City Staff prior to issuance of building permit. 7. A buffer between the residential properties to the east and the proposed project, through the use of a fence, landscaping or a combination of both shall be reviewed and approved by City staff prior to issuance of a building permit. The petitioner shall install said buffer at the same time Building #1 is constructed. 8. Replacement of chain link fence along the Mn/DOT right-of-way will be incorporated as part of this project. The fence design and installation shall be agreed upon and approved place prior to issuance of a building permit for Building #1. 9. City engineering staff to review and approve grading, drainage and utility plans prior to issuance of building permits. 10. The petitioner shall pay all water and sewer connection fees prior to issuance of a building permit. 11. All lighting in the development shall be shielded and downcast. Lighting shall be provided through free-standing lighting that adequately illuminate the sidewalk. 12. All crosswalks shall be installed using a colorized pavement pattern when connecting the sidewalk on each side of a driveway. All connections shall be accessible. 13. If the square footage of the footprint of any of the buildings proposed changes by more than 10% at that phase of the development, an S-2 master plan and TOD master plan amendment shall be required. 14. A Developm will be prepared by the City and shall be signed by the Petitioner prior to issuance of a building permit for Building #1.